Riyadh Metro
Saudi Arabia
Project Details
Location : Riyadh , Saudi Arabia
Type : MEP work for all elevated Line 4 stations
Client : FAST
Contractor : Technical Development co for Contracting
Scope of Work : The Riyadh Metro consists of six metro lines crossing a total length of 176 kilometers, with 85 stations. Line 4 Elevated Station was awarded to TD with 8 Stations Covering 29.6Km for Engineering, Procurement and Construction The Project Scope covers all Mechanical, Electrical and ELV.
Technical Data
Consists of 6 Stations and 4 ITPS.
Preparing as Mechanical, Electrical, HVAC, and Firefighting, shop drawing, technical document preparation, BOQ preparation, and As-built submission.